Conruction report 2025 December Parkville Residences

Despite the cold winter weather, construction of Parkville Residences is proceeding as planned.
Building:
The third floor has been concreted, the formwork for the fourth floor has been completed, and the necessary mechanical and electrical work has been completed. The bricklayer has started the masonry work on the ground floor.
Building B:
The 2nd and 3rd floors have been concreted, and construction of the vertical structures on the 4th floor has begun.
Building C:
The 4th floor has been concreted, revealing the first roof garden between buildings C and D. In addition, the formwork for the 5th floor has been completed. The masonry work on the ground floor has been completed. At the same time, construction of the facade walls on the 1st floor has begun.
Building D:
The floor of the 5th level has been concreted, and the reinforcement, inspection, and concreting of the vertical structures is already in full swing.
Choose your dream home from the Parkville Residences apartment selection!
Request a personalized offer from our colleagues:
https://intergal-group.hu
+36 1 700 3507