June report: we are already building upwards at Parkville Residences!

From the bottom up - this is how we progressed in June:
Building A
The last soil probe field probes have been successfully connected and pressure tested.In addition, another section of base slab has been poured, so the parking level is more than halfway complete.
Building B
The excavation is nearing the end, with landscaping and ballast construction currently underway.
Buildings C and D
The parking level -1 of both buildings is now fully completed.
In building D, the reinforcement of the ground floor is underway, while in building C, the preparation for the construction of the first floor has already started.
The pace of construction is therefore still outstanding and is now entering an increasingly spectacular phase.